Follow us

Author: IAC Board

Volunteers welcome to help decorate the IAC for the holidays

Dear residents, It's almost time for the holidays and several of our residents will be gathering again this year to decorate the lobby areas in the building. Any interested residents are welcome to join the festivities, which will begin at 10 a.m. Friday, Nov. 30. If you have any questions regarding holiday decorations, feel free to reach out...

October 2018 Board Meeting summary

Members present. Amanda Goehlert, Russ McQuaid, CJ O’Donnell and Chris Noll representing Ardsley Property Management. Resident Forum. No residents in attendance. Cleaning and Maintenance. Landscape beds. Landscape Solutions has completed the fall cleanup. The Board approved the 2019 landscape proposal, which is $9,015 fo cleanup, mulch and flowers over the summer and into early fall. The Board is...

Update: Power restored to building

Dear resident, The new main breaker has been replaced and power has been restored to the building. The power outage ran longer than expected due to complications with the incoming power source for which IPL needed to be called out for assistance. Mid-America Elevator was scheduled to be on site today to run checks of the two...

Update: planned power outage moved to Friday (tomorrow)

Dear resident, Unfortunately the main power breaker scheduled to be replaced Monday tripped again this afternoon. Gaylor Electric was able to restart the power to common areas but is not confident the damaged breaker will work through the weekend. Therefore the planned power outage to remove the existing breaker and install the new one has been moved...

Planned power outage Monday, Oct. 8

Dear resident, Next Monday, Oct. 8 electricians from Gaylor will be installing a new main power breaker to the building. They believe our current breaker is causing the common area power outages. The new breaker arrived this week and went through routine independent testing. Gaylor will need to shut off power to the whole building (units and...

Update on common area power

Dear resident, Thank you for your ongoing patience with a reduced number of operating elevators in the main building as we continue to prevent additional power outages to the common areas. Electricians have determined the main breaker needs to be replaced. The part is on order and will be installed next week. Once we know the exact...

Update regarding elevators and common area power

Dear resident, After a brief power outage to the common areas today, it appears the repairs made two weeks ago did not entirely fix the electrical issue. Our electricians believe the main breaker has shorted out the recently replaced trip module, which reduces the amps that the main breaker can handle by 30 to 50 percent. With...

Road closures this Saturday

Dear resident, This Saturday the Circle City Classic Parade will take place along the Downtown parade route from noon to 2 p.m. The parade will result in multiple street closures including Meridian and Pennsylvania streets from North Street to Monument Circle. Access to both garages as well as the south lot will still be available off of...